5 Operation and maintenance
IC Equipment Thin-Layer cell
■■■■■■■■
15
2
Unscrew the fastening screw for the reference electrode and remove
it.
3
Take out the reference electrode.
4
Insert the new reference electrode.
5
Retighten the fastening screw.
Note
Important: After an Ag/AgCl reference electrode has been
taken out!
The Ag/AgCl reference electrode may not be allowed to dry out. Follow
the directions for storage contained in the leaflet for the Ag/AgCl refer-
ence electrode.
5.2.3 Replacing the spacer
Depending on the application, the measuring cell can be operated with a
variety of different spacers. The different spacers are available as accesso-
ries (see Chapter 7, page 21).
The measuring cell must be disassembled in order to replace the spacer.
Proceed as follows to disassemble the measuring cell:
Disassembling the measuring cell
Prerequisites:
The measuring cell is switched off.
The measuring cell has been removed from the detector.
The electrode cables have been removed.